Sep 7, 2017 at 9:28 comment added anon The ticketing system is the big problem here. I can only see the tasks assigned to me (not status of previous depts) and I can only do the procedures I have been assigned. Only the coordinator can see if the tasks have been completed, I will only see it when I start working on it. I need to retour tasks that got assigned with the wrong procedure because otherwise it wont be correctly integrated in the pipeline. (Its a very strict and limited system)
Sep 7, 2017 at 9:17 history answered simbabque CC BY-SA 3.0